top of page

Husky - Beaver River Project

This environmentally sensitive HDD replacement beneath the Beaver River required a specialized approach. Ironbird installed stainless-steel TIPS on the pipeline — a unique solution designed for this application — and worked closely with the client, contractor, and engineering teams. The project was delivered safely and successfully with a 100% completion rate.

Husky - Beaver River Project
Beaver River Region
bottom of page